$A$ man carries a bucket of weight $60 \ N$ and walks $7 \ m$ in the horizontal direction,then climbs $5 \ m$ in the vertical direction. What is the work done by the man in $J$?

  • A
    $300$
  • B
    $420$
  • C
    $720$
  • D
    None of the above

Explore More

Similar Questions

$A$ body constrained to move along the $z$-axis of a coordinate system is subject to a constant force $F$ given by $F = -\hat{i} + 2\hat{j} + 3\hat{k} \text{ N}$,where $\hat{i}, \hat{j}, \hat{k}$ are unit vectors along the $x, y,$ and $z$-axes of the system respectively. What is the work done (in $J$) by this force in moving the body a distance of $4 \text{ m}$ along the $z$-axis?

$A$ body of mass $8 \ kg$,under the action of a force,is displaced according to the equation $s = \frac{t^2}{4} \ m$,where '$t$' is the time. Find the work done by the force in the first $4 \ s$. (in $J$)

$A$ force $\overrightarrow{F} = 5\hat{i} + 6\hat{j} + 4\hat{k}$ acting on a body produces a displacement $\overrightarrow{S} = 6\hat{i} - 5\hat{k}$. The work done by the force is: (in $J$)

$A$ body of mass $m$ kg is lifted by a man to a height of one metre in $30\, s$. Another man lifts the same mass to the same height in $60\, s$. The work done by them are in the ratio:

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo