$150$ workers were engaged to finish a piece of work in a certain number of days. $4$ workers dropped the second day,$4$ more workers dropped the third day and so on. It takes eight more days to finish the work now. The number of days in which the work was completed is

  • A
    $15$
  • B
    $20$
  • C
    $25$
  • D
    $30$

Explore More

Similar Questions

The interior angles of a polygon are in $A.P.$ If the smallest angle is $120^o$ and the common difference is $5^o$,then the number of sides is

Four numbers are in an arithmetic progression. The sum of the first and last terms is $8$ and the product of the two middle terms is $15$. What is the smallest number in the sequence?

Find the sum of all numbers between $200$ and $400$ which are divisible by $7.$

Let $S = \{(a, b, c) \in \mathbb{N} \times \mathbb{N} \times \mathbb{N} : a+b+c=21, a \leq b \leq c\}$ and $T = \{(a, b, c) \in \mathbb{N} \times \mathbb{N} \times \mathbb{N} : a, b, c \text{ are in } AP\}$, where $\mathbb{N}$ is the set of all natural numbers. Then, the number of elements in the set $S \cap T$ is:

The maximum sum of the series $20 + 19\frac{1}{3} + 18\frac{2}{3} + \dots$ is

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo