$A$ person has undertaken a construction job. The probabilities are $0.65$ that there will be a strike,$0.80$ that the construction job will be completed on time if there is no strike,and $0.32$ that the construction job will be completed on time if there is a strike. Determine the probability that the construction job will be completed on time.

  • A
    $0.488$
  • B
    $0.512$
  • C
    $0.320$
  • D
    $0.800$

Explore More

Similar Questions

$A$ bag contains $4$ red and $3$ black balls. $A$ second bag contains $2$ red and $3$ black balls. One bag is selected at random. If from the selected bag,one ball is drawn at random,then the probability that the ball drawn is red,is

$A$ bag contains $19$ tickets numbered from $1$ to $19$. $A$ ticket is drawn and then another ticket is drawn without replacement. The probability that both the tickets will show an even number is:

$A$ bag $X$ contains $2$ white and $3$ black balls and another bag $Y$ contains $4$ white and $2$ black balls. One bag is selected at random and a ball is drawn from it. Then,the probability for the ball chosen to be white is:

If $A$ and $B$ are independent events and $P(A) = 0.4$,$P(A \cup B) = 0.6$,and $P(B) = p$,then the value of $p$ is . . . . . . .

Two marbles are drawn in succession from a box containing $10$ red,$30$ white,$20$ blue and $15$ orange marbles,with replacement being made after each drawing. Then the probability,that the first drawn marble is red and the second drawn marble is white,is

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo