$A$ string is used to pull a block of mass $m$ vertically up by a distance $h$ at a constant acceleration $\frac{g}{3}$. The work done by the tension in the string is ..............

  • A
    $\frac{2}{3} m g h$
  • B
    $\frac{-m g h}{3}$
  • C
    $m g h$
  • D
    $\frac{4}{3} m g h$

Explore More

Similar Questions

The work done in moving an object from the origin to a point whose position vector is $\vec{r} = 3 \hat{i} + 2 \hat{j} - 5 \hat{k}$ by a force $\vec{F} = 2 \hat{i} - \hat{j} - \hat{k}$ is:

$A$ cubical vessel of height $1 \,m$ is full of water. What is the amount of work done in pumping water out of the vessel (in $\,J$)? (Take $g = 10 \,m \,s^{-2}$)

How much work does a pulling force of $40 \,N$ do on a $20 \,kg$ box in pulling it $8 \,m$ across the floor at a constant speed? The pulling force is directed at $60^\circ$ above the horizontal.

$A$ particle of mass $m$ is projected at an angle $\alpha$ to the horizontal with initial velocity $u \ m/s$. What is the work done by gravity during the time it reaches its highest point?

$A$ particle moves from $(1, 0, 3)$ to the point $(-3, 4, 5)$, when a force $F = \hat{i} + 5 \hat{k}$ acts on it. The amount of work done in joules is:

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo