Maximum value of $Z=100 x+70 y$ subject to $2 x \geq 4, y \leq 3, x+y \leq 8, x, y \geq 0$ is

  • A
    $800$
  • B
    $940$
  • C
    $400$
  • D
    $710$

Explore More

Similar Questions

The maximum value of the objective function $z=2x+3y$ subject to the constraints $x+y \leq 5$,$2x+y \geq 4$,$x \geq 0$,and $y \geq 0$ is

The difference between the maximum value and minimum value of the objective function $z = 3x + 5y$ of a linear programming problem subject to constraints $5x + 10y \leq 50$, $x + y \geq 1$, $y \leq 4$ and $x \geq 0, y \geq 0$ is $3\lambda$. Then the value of $\lambda$ is

The maximum value of $z=6x+8y$ subject to the constraints $x-y \geq 0$,$x+3y \leq 12$,$x \geq 0$,$y \geq 0$ is:

$A$ factory manufactures two types of screws, $A$ and $B$. Each type of screw requires the use of two machines, an automatic and a hand-operated one. It takes $4 \, \text{minutes}$ on the automatic and $6 \, \text{minutes}$ on the hand-operated machine to manufacture a package of screws $A$, while it takes $6 \, \text{minutes}$ on the automatic and $3 \, \text{minutes}$ on the hand-operated machine to manufacture a package of screws $B$. Each machine is available for at most $4 \, \text{hours}$ on any day. The manufacturer can sell a package of screws $A$ at a profit of $Rs. \, 7$ and screws $B$ at a profit of $Rs. \, 10$. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximize his profit? Determine the maximum profit.

Difficult
View Solution

The correct constraints for the given feasible region are:

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo