Two godowns $A$ and $B$ have grain capacity of $100$ quintals and $50$ quintals respectively. They supply to $3$ ration shops,$D$,$E$ and $F$ whose requirements are $60, 50$ and $40$ quintals respectively. The cost of transportation per quintal from the godowns to the shops are given in the following table:
Transportation cost per quintal (in $Rs$)
From/To $A$ $B$
$D$ $6$ $4$
$E$ $3$ $2$
$F$ $2.50$ $3$

How should the supplies be transported in order that the transportation cost is minimum? What is the minimum cost?

Vedclass pdf generator app on play store
Vedclass iOS app on app store
(D) Let godown $A$ supply $x$ and $y$ quintals of grain to the shops $D$ and $E$ respectively. Then,$(100-x-y)$ will be supplied to shop $F$.
The requirement at shop $D$ is $60$ quintals. Since $x$ quintals are transported from godown $A$,the remaining $(60-x)$ quintals will be transported from godown $B$.
Similarly,$(50-y)$ quintals and $40-(100-x-y) = (x+y-60)$ quintals will be transported from godown $B$ to shop $E$ and $F$ respectively.
Total transportation cost $z$ is given by:
$z = 6x + 3y + 2.5(100-x-y) + 4(60-x) + 2(50-y) + 3(x+y-60)$
$z = 6x + 3y + 250 - 2.5x - 2.5y + 240 - 4x + 100 - 2y + 3x + 3y - 180$
$z = 2.5x + 1.5y + 410$
The problem is to minimize $z = 2.5x + 1.5y + 410$ subject to:
$x+y \leq 100, x \leq 60, y \leq 50, x+y \geq 60, x, y \geq 0$.
The corner points of the feasible region are $A(60, 0), B(60, 40), C(50, 50),$ and $D(10, 50)$.
Corner point$z = 2.5x + 1.5y + 410$
$A(60, 0)$$560$
$B(60, 40)$$620$
$C(50, 50)$$610$
$D(10, 50)$$510$ (Minimum)

The minimum value of $z$ is $510$ at $(10, 50)$.
Thus,the amount of grain transported from $A$ to $D, E, F$ is $10, 50, 40$ quintals respectively,and from $B$ to $D, E, F$ is $50, 0, 0$ quintals respectively.

Explore More

Similar Questions

The Linear Programming Problem ($L$.$P$.$P$.) to minimize $z = 30x + 20y$ subject to the constraints $x + y \leqslant 8$,$x + 2y \geqslant 4$,$6x + 4y \geqslant 12$,$x \geqslant 0$,and $y \geqslant 0$ has:

$A$ manufacturer produces nuts and bolts. It takes $1\, hour$ of work on machine $A$ and $3\, hours$ on machine $B$ to produce a package of nuts. It takes $3\, hours$ on machine $A$ and $1\, hour$ on machine $B$ to produce a package of bolts. He earns a profit of $Rs.\,17.50$ per package on nuts and $Rs.\,7$ per package on bolts. How many packages of each should be produced each day so as to maximise his profit,if he operates his machines for at the most $12\, hours$ a day?

Difficult
View Solution

For the linear programming problem, $x + 2y \leq 10$, $3x + y \leq 12$, $x, y \geq 0$, the maximum value of $z = 5x + 10y$ occurs at every point on the line segment joining the points..

In the following figure, the shaded region represents the system of constraints:

$A$ dietician wishes to mix together two kinds of food $X$ and $Y$ in such a way that the mixture contains at least $10$ units of vitamin $A$,$12$ units of vitamin $B$,and $8$ units of vitamin $C$. The vitamin contents of one $kg$ of food are given below:
Food Vitamin $A$ Vitamin $B$ Vitamin $C$
$X$ $1$ $2$ $3$
$Y$ $2$ $2$ $1$

One $kg$ of food $X$ costs $Rs. 16$ and one $kg$ of food $Y$ costs $Rs. 20$. Find the least cost of the mixture which will produce the required diet?

Difficult
View Solution

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo